And scroll down to see more details on each with installation hints and tips below.
How should roof sheathing be installed at peak.
Check the nailing surface is level step 2.
It spans the rafters to support the roofing and in the case of panel sheathing such as plywood or osb it acts as a diaphragm with the walls to resist horizontal loads.
How to correctly install plywood or osb roof sheathing.
Begin applying the sheets from the bottom of the roof the eaves and work your way up to the ridge.
Measure from the peak of the roof along each rafter on one side of the roof to determine the exact length of each.
In areas where the wind speed is greater than 130 mph nails for attaching the roof sheathing to intermediate supports should be spaced 6 inches on center for at least the first 48 inches from the ridges eaves and gable end walls.
The edge of the shingles should hang over a roof between an inch and an inch and a half or between a half inch and three quarters of an inch if drip edge flashing is installed.
How should the sheathing meet at the roof peak when there will be no ridge vent.
Too little can allow water to seep into rake or fascia boards.
How to install roof sheathing 1.
Leave a slight gap as if the sheathing was cut a little short and install the sheathing to a matching edge no gap.
Ventilate the roof according to current building codes step 3.
It is important here that the sheathing at the eave line be exactly perpendicular to the rafters so that the sheets will meet at the centers of the rafters.
Properly fasten panels including fastening and spacing hints step 4.
Cover sheathing with.
This is a simple pitched roof line with ridge beam and rafters attached with slope hangers.
Position the first piece of plywood.
Nails size 8b should be installed every 6 inches on edges and every 12 inches in the center area.
Too much overhang and the shingles could blow off in high winds.
Cut each rafter tail on the chalk line with a circular saw to ensure that every rafter is the same length.
The last course at the top may need to be rip cut if the roof is not in 4 foot increments.
I have seen two thoughts.
The fasteners should be spaced only 4 inches apart on the panel edge at the gable end wall framing.
Also use more nails and place them closer together to build a stronger roof.
When installing roof sheathing use nails with longer nail shank larger diameter and a larger head than may be required.