Insert the pipe into the chimney outdoor enclosure.
How to attach the shield to the roof.
Make a cutting on one of the sides of the horizontal roof beam on an angle.
I am thinking if it is strong enough to attach r.
Cover the walls with board and batten 4 by 8 foot sheets of plywood nailed vertically to the sheathing strips with the seams covered by 1 by 4 inch batten boards.
Cut another square opening through the roof.
Push the pipe through it to the outside of the house.
Then you put on the shingles.
Fit a fire stop into the joist shield and attach it to the ceiling joist.
You have to do it thoroughly so that the rafters sit flush on it.
Get the total number of rafters and multiply times 2 then add about a foot to the total length just so you don t run short.
The drip edge is then installed on top of the ice barrier.
If you are not using the elastomeric membrane i would put roofing paper over the entire roof.
Count the number of rafters in your space and measure the distance between a few random sets.
Many shingle guarantees require roofing felt because it makes the shingles last longer.
Cut the foil this can easily be done on a sidewalk or in the driveway.
Fourth you need to put a drip edge on the remaining sloped sides of the roof over the building paper and over the ice and water shield.
This seals the sheathing fascia joint and blocks the water s pathway into the eaves and soffit.
Attach roofing to the garage wall with bent metal flashing that goes up the wall and over the roof.
Attach the horizontal beam by using a nail gun.
If the roof has multiple ridges install zincshield at the top of each ridge.
After that to make it flush with the roof of the existing house cut the two outer rafters.
Zincshield is installed at the top of the roof below the ridge cap ridge vent or below the first row of shingles.
They suggest that the membrane lap down about an inch onto the face of the fascia and then up onto the roof sheathing.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Along with your rolls of zincshield to insure correct installation.
The premade ones are much quicker and probably neater looking.
You can cut strips of zinc flashing copper and lead work too and slide them under a course of roof shingles to kill lichen and moss growing there or you could just buy these premade strips from shingle shield.
Be sure to order gsp 95 adhesive or zincshield nails.
The heat shield ripped around the studs and it is just dangling under the car and making rattling noises.
Generally rafters are about 2ft 24 apart.