How to bed roof tiles.
The ridge tiles have to seal the top of the roof and overlap onto the slates tiles on each side by at least 75mm 3 inches for slate and flat faced tiles this is achieved by using a fairly stiff 1 3 cement sharp sand mortar bed along the tops of the tiles slates.
Boral tile roofing for your melbourne house extension project.
This involves carefully removing the tile.
All about interlocking roof tiles.
And applying mortar and rebedding the tile.
Is your roof in need of some cosmetic repairs.
The supplier of the tiles should recommend the spacing up the roof between the battens known as the gauge this usually varies according to the size of the tiles the pitch of the roof and the degree of exposure.
Remove all cement and dust off tiles.
With 28 years exp.
After you have determined the distance between the first two battens measure the distance and set battens using that.
Jad our qualified roofing specialist will take you through the steps to re bed your ridge tiles using monier.
Concrete roof tiles used with reo to make a curved raised garden bed.
Here are my 6 steps to remove and correctly replace the cement under a ridge tile if you are looking to replace the cement on a gable apex then.
The gauge is in fact the same as the margin which is the length of the tile exposed.
If a tile becomes loose it needs to be rebedded.
Replace any damaged tiles ridges.
Use two tiles to determine the spacing required for the battens.
Checking for loose tiles.
Lift all ridge tiles.
When a roof repair specialist does repointing they follow a step by step procedure that includes.
Boral roof tiles is the best choice.
Do it yourselfer 1.
Preparing the roof and tile for rebedding.
Prepare new cement 3 parts sand to 1 part cement.
Roof re bedding is no simple task and you do need the right type of equipment and products to execute this repair procedure.
Removing the old bedding.