This will leave gaps between the bottom of the pickets and the ground.
How to install picket fence panels on a slope.
A scalloped partial privacy fence installed on a slope by the fence authority.
At the end fill up the hole completely with concrete.
The step method is so named because the fence mimics a set of stairs.
Install the next picket flush against the spacer to get the proper 3 1 2 inch spacing and to keep the picket plumb.
For that dig holes for the posts as you would normally do for the regular fencing proceedings.
When building a fence on uneven terrain one option is to follow the contours of your yard.
Hang the spacer on the top rail against a corner picket.
Let s look at some of the techniques you can use when installing a fence on a slope or a hill.
This video gives you some tips on how to put up a privacy fence on a sloped piece of land.
This allows the overall line of the fence to follow the slope in a stair step fashion.
Moreover even when the slope is gentle raking creates a fair amount of extra work when installing a chain link fence because you have to cut the ends of the metal mesh at an angle.
The posts are installed plumb and each panel steps lower or higher as the grade changes.
Building a fence with preassembled panels.
When building a fence on a slope using preassembled panels the entire panel is stepped up or down so it remains level.
Use the rack method to install the fence on a gentle slope and install the fence on a slope steeper than 35 degrees using the step method.
Just type lsailor1 in the youtube se.
Then add concrete to the base of the hole and then put the post in upright position.
The rack method procedure in which the rails follow the.
The backer rails are perpendicular to the pickets and remain level rather than parallel to the slope.
As the first step start by installing the fence posts.
Attach a short block of 2 by 4 to the back of a longer straight 2 by 4.
Tip typical spacing for wood and metal fences is 8 feet but if you re using the step method on a steep slope you ll probably have to reduce the spacing to avoid.
It gradually steps up or down the slope.