Rafter radiation shield installation roof support installation roof flashing installation roof guy installation maintenance and cleaning of chimney chart 1 offset chimney installation chart 2 chimney height above the roof chart 3 connector pipe clearances cathedral support replacement parts list installation record product registration.
How to install selkirk chimney support.
Then place the collar over the shield fig.
Please click here for product and technical assistance or a handy rep locator.
Transitioning from single wall black stove pipe to insulated double wall class.
Approval of this factory built chim ney is based on the use of parts supplied by selkirk metalbestos and installation in accordance with these instructions.
To keep attic insulation away from the chimney install the two piece metal insulation shield.
Strength safety and performance are at the heart of every product we make.
Figures 5 6 show the 2 most common types of decorator ceiling support installation.
The chimney penetrates a roof.
Installation procedures the decorator ceiling support will support up to 40 ft.
Offset support or an interior resupport.
16 and nail the shield to the framing fig.
13 m of chimney sections all of which must be installed above the support.
See figures 2 3 and 4.
Install the support immediately above the offset or at 9 14 m 30 intervals.
In this video i am installing a chimney in a cottage if you have never installed a chimney before you should contact a professional chimney installer or che.
Frame on all 4 sides a level square opening.